Destin 8 – Border Operating Model required Information
Information needed to differentiate between the Temporary Storage Model and Pre-Lodgement model as operated in Ports where MCP provide the CSP functionality.
MCP have distributed the following guidance notes needed for their customer, which aim to provide you with the outline information required:
Destin8 Inventory Linking - Temporary Storage Model or Pre-Lodgement Model?
Further information, regarding which approach is adopted in specific locations, can be found on Page 26 of the Border Operating Model.
The current version of the Border Operating Model can be downloaded here: